
Aintree Hospital Liverpool
Aintree Hospital Liverpool
Architectural Coating Solutions undertook various repair and respray work at Aintree hospital. For five weeks, the team worked on multiple locations throughout the hospital to get it passed off on time and on a budget.
The cladding had been damaged since it was installed. There were various dents and scratches throughout the new extension of the building, and BAM needed a fast, cost-effective method to meet the deadline for when the hospital went live. The panelling was three different colours, which all had to be colour matched by our supplier before commencing work. With the panelling being a metallic finish, it is essential to get the repair work perfect so no mapping occurs. It is also necessary to use fade-out thinners to blend the new paint into the panel to stop dry spots.
As you can see from the photographs, we enabled a brand new finish for a fraction of the replacement cost. The client was very impressed with the results, and we later got called back to finish the project’s final phase.
Read more information on cladding repairs and spraying.







