Fir Vale School

ACS spent weeks at Fir Vale undertaking various spray works and repair work.

Ranging from the inside to the playground canopies, there was significant damage throughout the building. With a tight deadline looming, we had a lot of work to carry out.

acs-paint-spraying-school-windows-5
acs-paint-spraying-school-windows-4

As you can see from the pictures here, a gap at the top of the canopy needed to be filled level and re-sprayed.

The end verdict stunned our client and saved a lot of hassle, time, and money. We repaired scratches and dents on window frames and curtain walling throughout the building on top of the work mentioned above.

If you want more information or to book a quotation, you can contact ACS spraying here.

acs-paint-spraying-school-windows-2
acs-paint-spraying-school-windows-5