606 Bradford Warehouse
Dilapidation Project
Discover how ACS Coatings delivered a complete roof and cladding refurbishment package to prepare a large commercial warehouse for market.
The Client
606 Bradford
606 Bradford is a substantial warehouse site located in West Yorkshire. The unit required a full protective refurbishment so it could be returned to the commercial property market in excellent condition.
The building had several areas of deterioration across the roof, cladding, and metalwork, and the client needed a reliable contractor capable of delivering a fast and comprehensive dilapidation service.
That’s where we stepped in.

What They Asked For
The client required a full refurbishment of the building fabric along with long-term protective systems. This included:
- A complete liquid coating system to achieve a 30-year roof guarantee
- New liquid gutter linings
- Full pressure washing of the building exterior and all hard standings
- A full cladding coating system
- Complete decoration of all metalwork and associated surfaces.
They also needed everything to be delivered to a high standard so the property could be marketed with confidence.
What We Did
With a team of 10 operatives, ACS Coatings carried out a full programme of refurbishment and protective works.
This included:
- Application of a high-performance liquid roof coating system to extend the lifespan of the roof
- Installation of new liquid gutter linings to prevent future leaks
- Full commercial pressure washing to all elevations and hard-standing areas
- On-site spraying and cladding coatings to restore the external envelope
- Panel replacements, where required
- Decorative coatings to all metalwork and exposed substrates.
Every part of the building was also treated to guarantee a consistent finish, long-term protection, and a clean, modern appearance.


How We Did It
The project was originally programmed for 14 weeks. However, the ACS team completed the work in only 8 weeks, which included additional variations. This was achieved through out-of-hours working, strong supervision, and a detailed programme that coordinated all trades efficiently.
Clear communication and proactive planning were crucial to this job’s success and meant that productivity remained high throughout. Our team also had to adapt to new challenges throughout the project, and maintained excellent quality across the full scope of the work carried out.
The Result
606 Bradford was completely transformed as a result of the work carried out by ACS Coatings. The roof and gutter systems now benefit from long-lasting protective coatings, the cladding has been fully restored, and the building presents as a modern, clean, and well-maintained asset.
All in all, the property is now ready to re-enter the market with an improved appeal and long-term peace of mind for whoever decides to buy it. The client provided fantastic feedback, too, praising the speed of delivery, attention to detail, and the professionalism of the team.
This project highlights the capability of ACS teams to deliver rapid, high-quality dilapidation works on large commercial buildings through expert planning and outstanding workmanship.


Get in Touch
Ready to see how we can transform your commercial property?
Contact the experts at ACS Coatings today for a free quote for roof coatings, cladding spraying, and full commercial dilapidation works.