Aztec
Multi-Unit Roof and Refurbishment Works
Discover how ACS Coatings delivered a high-quality protective refurbishment across four live commercial units at one of Bristol’s busiest business parks.

The Client
Aztec West Business Park
Aztec West Business Park is home to a wide range of commercial units and office spaces, all of which operate in a busy environment. The client required a reliable contractor to deliver a multi-unit refurbishment programme with minimal disruption to tenants.
Given the scale of the park and the number of businesses operating, the work needed to be carefully planned and completed to a consistently high standard.

What They Asked For
The client needed a complete protective refurbishment across four occupied units.
This included:
- High-performance protective roof coating systems
- Replacement and installation of new skylights
- Liquid gutter lining systems
- Aesthetically pleasing protective coatings for external shutters.
All buildings were to remain live throughout the project, which meant the work had to be delivered safely, efficiently, and with minimal disruption.
What We Did
With a seven-strong team, ACS Coatings carried out a full programme of refurbishment and protective works across the four units.
This included:
- Full preparation and application of a high-quality roof coating system
- Removal of old skylights and installation of new units to improve natural daylight
- Application of liquid gutter linings to improve weather performance
- Decorative coatings for external shutters with durability and appearance in mind.
Each unit was also upgraded with long-term protective systems designed to extend the lifespan of the roofs and improve the overall presentation of the buildings. Our team made sure that surface preparation, application, and final detailing all met the client’s required standards, too.
And to maintain consistency, ACS followed a robust plan at every stage. This meant that the coating systems bonded correctly, the skylights were installed safely, and the shutters received a clean, even finish. By coordinating all elements so carefully, the team delivered a uniform result across all four units.


How We Did It
Because all units remained fully occupied, the work needed detailed planning and ongoing communication with site managers and tenants. Noisy activities were scheduled around business needs, and the team worked flexibly to manage changing weather conditions. This helped the programme stay on track without disruption.
Working safely in a live environment also required clear access management. The team maintained controlled working zones, used protective barriers, and followed a clear communication plan to keep occupiers informed throughout. This approach supported both tenant safety and project efficiency.
Despite the complexities of the work across four live units, the programme remained well coordinated. Each stage was completed systematically, from roof preparation to the installation of new skylights, followed by gutter lining and shutter coatings. As a result, the overall project progressed smoothly and met the client’s timeline expectations.
The Result
All four buildings were successfully refurbished and handed over on completion, with the roofs now benefiting from a long-lasting protective coating. The installation of new skylights improved internal lighting conditions, too, while the upgraded gutters and shutter coatings improved performance and produced a cleaner, more modern appearance.
The site manager and tenant representatives provided excellent feedback, noting the professionalism of the team, the quality of the work, and the lack of disruption. The project demonstrated ACS Coatings’ ability to manage multi-unit refurbishment works in occupied environments, balancing technical quality with strong communication.


Get in Touch
For commercial roof coatings, gutter lining systems, and full external refurbishment services, contact the experts at ACS Coatings today.