Hyundai Dealership

Hyundai is one of the world’s leading automotive manufacturers, with dealerships across the UK. Maintaining a modern, professional appearance is essential for dealerships where first impressions directly influence customer perception and sales success.

And for a busy forecourt, any refurbishment work must be delivered without disrupting vehicle sales, customer visits, or daily business activities.

The client required a complete external refurbishment package for a live Hyundai dealership. The building’s exterior had weathered over time and needed restoration to meet the brand’s high presentation standards.

The scope of work included:

All work needed to be completed while the dealership remained fully operational, too. This meant working around customer visits, vehicle deliveries, test drives, and the constant movement of staff and vehicles across the forecourt.

ACS carried out a full external transformation of the dealership. The project restored the building’s appearance through specialist cleaning, protective coatings, and comprehensive decoration works.

We began with thorough commercial pressure washing across all external surfaces because years of road dirt and weathering had dulled the building’s appearance. Our industrial-grade cleaning equipment removed all contaminants and prepared surfaces for the coating works that followed.

The cladding re-coating programme addressed all external panels. We applied high-performance coating systems that restore colour, provide weather protection, and extend the lifespan of the cladding. This modern coating technology offers superior durability compared to original finishes, which means the dealership also benefits from better long-term performance.

Once this was complete, the external decoration work completed the transformation. We treated all metalwork, fascias, and architectural details to create a uniform, professional finish across the entire building. This comprehensive approach meant every visible element received the attention it needed, not just the obvious problem areas.

Throughout the project, the dealership remained fully operational. Customers continued to visit the showroom, vehicles were displayed on the forecourt, and sales activity proceeded as normal.

Our team of expert operatives worked around these activities to deliver the refurbishment without impacting the client’s business.

Working in a live car forecourt environment required careful planning from the outset. As such, vehicle movement, customer parking, and access to the showroom all needed to be maintained throughout the project.

Strong communication, therefore, proved essential, and we coordinated daily with the dealership management team to understand their operational priorities and schedule our activities accordingly. When important customer appointments or vehicle handovers were planned, we adjusted our work areas to keep those zones clear and accessible.

Safety was also paramount in this environment. Car forecourts present unique hazards with constant vehicle movements, customer foot traffic, and the proximity of working at height due to public areas. We therefore implemented strict safety procedures, used clear barriers and signage, and maintained controlled working zones at all times.

The project was delivered efficiently through experienced site supervision. Our team understands how to work in retail environments where appearance and customer experience matter. As a result, we kept work areas clean and tidy, minimised noise during busy time periods, and maintained a professional presence throughout.

Attention to detail also made the difference between adequate work and excellent results. We made sure that clean edges on all coating work protected vehicles and customer areas from overspray. We also inspected every section before considering it complete. This methodical approach delivered the high-quality finish the client expected.

The dealership exterior was completely refreshed and modernised. The building now presents a clean, professional appearance that reflects well on the Hyundai brand and creates a positive impression for customers visiting the forecourt.

Key outcomes included:

  • Refreshed and modernised dealership exterior across all visible areas
  • Minimal disruption to the client’s daily operations and sales activities
  • High-quality finish delivered across all external areas
  • Protected cladding that will resist weathering and maintain appearance
  • Zero incidents or customer complaints throughout the project
  • Positive client feedback on both workmanship and professionalism
  • Improved overall appearance and presentation of the dealership.

The successful delivery demonstrated ACS Coatings’ capability to manage commercial refurbishment works in live retail environments. Our ability to maintain quality standards while working around operational constraints made this project a success for both the client and their customers.

This project highlights our experience in automotive retail facilities and our understanding of how to deliver excellent results without disrupting business operations.



Pye Academy

Eddisons is a leading property consultancy firm managing commercial and educational properties across the UK. Their portfolio includes schools where building maintenance must be delivered without disrupting the learning environment or compromising student safety.

For primary schools, any refurbishment work requires exceptional planning and safeguarding procedures. The contractor must maintain strict safety controls while minimising disruption to teaching activities and daily school operations.

ACS was appointed as Principal Contractor to deliver a refurbishment package at Pye Academy. The primary school had experienced ongoing roof leak issues that needed a permanent solution, alongside general refurbishment works to improve the building’s condition.

The scope included:

  • Roof refurbishment works
  • External decoration works
  • Solar installation coordination requirements.

All work needed to be completed within a live primary school environment. This meant protecting hundreds of young children, maintaining teaching schedules, and following strict safeguarding procedures throughout the project.

ACS Coatings managed and delivered the full refurbishment while the school remained fully open as usual. As Principal Contractor, we coordinated all site activities, managed health and safety, and made sure every aspect of the job met the standards required for educational environments.

The roof refurbishment addressed the school’s persistent leak problems through specialist coating and waterproofing systems. We also installed an Alltimes Coatings roof coating system that provides long-term protection and extends the roof’s serviceable life significantly.

For felt roof areas, we applied PMMA waterproofing systems. This advanced waterproofing technology creates a seamless, permanently bonded membrane that eliminates leaks and prevents water ingress. PMMA systems offer superior performance compared to traditional felt repairs and provide a long-term solution rather than a temporary fix.

The combination of specialist coatings and PMMA waterproofing permanently resolved the ongoing leak issues. This gave the school confidence that classrooms and learning spaces would remain dry regardless of weather conditions.

External decoration works also refreshed the school’s aesthetic appearance. We treated all external surfaces to create a clean, well-maintained look that reflects positively on the school and provides long-term protection against weathering.

As Principal Contractor, we also coordinated solar installation requirements. This involved scheduling work to integrate with the roofing programme, which meant proper preparation of roof surfaces, and coordinating with solar contractors to deliver a seamless project.

Working within a live primary school required detailed planning from the start, and children’s safety was the absolute priority throughout the project. We developed comprehensive risk assessments, established controlled working zones, and maintained strict barriers between work areas and school spaces.

All operatives also completed full DBS checks before attending the site. This safeguarding requirement is non-negotiable for educational environments, and we made sure every team member had proper clearance before they set foot on school grounds.

Communication also proved essential to project success. We held regular meetings with school leadership to discuss work plans, upcoming activities, and any potential disruptions. This allowed the school to plan around our activities and inform staff, parents, and pupils about what to expect.

Noise management was also carefully controlled. Loud activities were scheduled during break times, lunch periods, or after school hours wherever possible. This reduced disruption to classroom teaching and maintained a suitable learning environment.

As Principal Contractor, ACS maintained strict health and safety controls at every stage. We conducted daily safety briefings, monitored site conditions continuously, and enforced safety procedures rigorously.

The roofing works also presented technical challenges, with felt roof areas needing complete preparation before PMMA application. Surface cleaning, repairs to substrate damage, and proper priming also had to be completed to manufacturer specifications for maximum performance.

The project delivered a complete transformation of Pye Academy’s roof and external areas. The school now benefits from a permanently waterproofed roof system that has eliminated the leak issues that previously disrupted teaching and damaged internal areas.

Key outcomes included:

  • Successful delivery within a live educational environment with hundreds of pupils on site
  • A long-term waterproofing solution was installed to eliminate roof leaks permanently
  • Zero safeguarding incidents or safety concerns throughout the project
  • Minimal disruption to teaching activities and daily school operations
  • Excellent feedback received from both Eddisons and school stakeholders
  • High-quality finish across roofing and external decoration elements
  • Solar installation requirements successfully coordinated and completed
  • Strengthened working relationship with the client following project completion.

The positive feedback from both the client and school leadership reflected the professionalism and care demonstrated throughout the project. Working in educational environments requires a different approach compared to standard commercial sites, and our team’s experience in school refurbishment projects ensured this was delivered to the highest standards.

This project also demonstrates ACS Coatings’ capability to act as Principal Contractor on complex refurbishment programmes in sensitive environments where safeguarding, safety, and minimal disruption are paramount concerns.



Cloister Way, Ellesmere Port


CBRE is one of the world’s largest commercial real estate services and investment firms. Their portfolio includes critical industrial and commercial properties, where maintaining operational performance and building integrity is essential.

For this project, maintaining roof integrity is about ensuring the roof is in optimal condition. It’s also about not interrupting operations for the hundreds of staff and tenants who depend on the building.


CBRE required a full roof restoration package at Cloister Way, Ellesmere Port. They needed multiple performance and maintenance issues addressed across the roof system.

This included:


All work needed to be completed within a live operational environment. This required strict safety protocols, careful coordination with building management, and zero tolerance for disruption to business operations.

ACS Coatings delivered the complete restoration package. We carried out all roofing and refurbishment works safely and efficiently while the facility remained fully operational.

The project began with extensive commercial pressure washing to remove years of dirt and contamination from the roof. This created the ideal substrate for coating applications and allowed our team to assess the condition of all roof elements.

Following surface preparation, we carried out comprehensive cut-edge corrosion treatment across all affected areas. This involved removing active corrosion, applying specialist primers, and sealing vulnerable edges with protective coatings. These coatings are designed to prevent future rust formation and extend the roof’s lifespan.

The liquid roof coating system was then applied across the entire roof. This created a seamless, waterproof barrier offering superior weather protection to traditional roofing materials. Modern liquid roof coatings were used for UV resistance and durability, which significantly reduces future maintenance requirements.

Skylight replacement required careful planning and execution to avoid any impact on the spaces below, which our experienced operatives managed without incident. Our team replaced aged and damaged skylights with new units that improve natural light penetration and maintain thermal efficiency.

Finally, we installed the Plygene gutter lining system throughout the roof drainage network. This high-performance lining created a durable, watertight seal within existing gutters. The result is no leaks or water damage without the cost and disruption of complete gutter replacement.

The project was completed during some of the wettest months of the year. This presented significant challenges for commercial roof repairs and coating applications. Persistent rain, cold temperatures, and limited weather windows all threatened to delay the programme and extend the project timeline.

However, our team completed the project within the required timeframe through careful planning and flexible working schedules. We monitored weather forecasts continuously, adjusted daily work plans to maximise productive hours, and coordinated closely with building management to ensure safety and minimal operational disruption.

Working within a live industrial facility also required strict adherence to health and safety protocols and coordination with operational staff. Our operatives completed all necessary safety clearances, followed site-specific working procedures, and maintained constant communication with facilities management throughout.

The combination of challenging weather and the operational constraints of an active facility made this a complex project. However, our experience in delivering commercial building refurbishment in demanding environments meant we could adapt quickly and maintain quality standards.

Most importantly, we completed the entire project ahead of schedule. This demonstrates the efficiency of our team and the effectiveness of our planning and coordination.

The completed roof restoration transformed the building’s performance and appearance while significantly extending its serviceable life. The comprehensive approach addressed existing issues and prevented future problems, giving CBRE a roof system that will perform reliably for years to come.

Key outcomes included:

  • Project completed ahead of the original programme schedule
  • High-quality finish delivered across all works despite challenging weather
  • Improved roof protection and waterproofing performance
  • Extended roof lifespan through professional cut-edge corrosion treatment
  • Enhanced natural lighting through new skylight installation
  • Long-term gutter protection via Plygene lining system
  • Zero disruption to business operations throughout the project
  • Minimal disruption to site operations

The successful delivery and quality of workmanship led to additional work opportunities with CBRE. This shows their confidence in ACS Coatings’ ability to deliver complex projects in challenging environments.

This project showcases ACS Coatings’ capability to manage large-scale commercial roof restoration works on industrial and commercial properties, hitting programme targets and quality standards regardless of external challenges.



Tysley Industrial Unit


JLL is one of the world’s leading commercial property management firms, overseeing industrial, retail, and office portfolios across the UK. Their properties require regular maintenance and refurbishment to protect asset values and maintain tenant satisfaction.

The client required a large-scale external refurbishment package for an industrial unit at Tysley. The roof covering, approximately 16,000m², needed restoration, and external areas required refreshing to improve both protection and appearance.

The scope included:

All works also needed to be delivered while the industrial unit remained operational. This meant coordinating around tenant activities and maintaining access to the facility throughout.

Our team completed a full roof restoration package across the entire 16,000m² roof area. Given the scale, this represented one of our larger roofing projects and required significant resources and careful planning.

We used specialist liquid coating systems supplied by HD Sharman. These high-performance coatings create seamless waterproof membranes that protect against water ingress while accommodating thermal movement. The HD Sharman systems also offer superior durability compared to traditional roofing materials and provide long-term protection that reduces future maintenance costs.

Before coating application, our team carried out extensive surface preparation across the entire roof. We cleaned all areas thoroughly, addressed any substrate damage, and ensured surfaces were properly prepared for the coating system. This preparation work is essential for achieving proper adhesion and long-term performance.

Alongside the roofing work, we carried out external cladding decoration to refresh the building’s appearance. Years of weathering had dulled the cladding finish, but our coatings restored the original colour and provided renewed protection against UV exposure.

Finally, window frame redecoration completed the external transformation. We treated all frames to create a uniform, professional finish that complemented the restored roof and cladding.

This comprehensive approach meant every visible element of the building received attention.

Coating 16,000m² isn’t something you complete in a few days, and it requires careful planning. We developed a phased approach that divided the roof into manageable sections, allowing us to progress systematically while maintaining quality standards.

Our experienced roofing teams worked through each phase methodically. Surface preparation, primer application, and topcoat layers all had to be completed to manufacturer specifications. And we maintained close site coordination to guarantee smooth transitions and avoid gaps or inconsistencies in the finished coating.

Weather monitoring was also essential because liquid coating systems need specific temperature and humidity conditions for proper curing. Our site management team tracked forecasts and adjusted daily work plans to maximise productive hours during suitable weather windows. This proactive approach helped us hit our time constraints despite the unpredictable British weather.

Working within a live industrial environment also required careful coordination. We maintained clear communication with the tenant and scheduled our activities to minimise any potential disruption. Access routes remained clear, too, and we made sure our work areas never interfered with daily operations.

Safety controls were paramount given the scale and height of the works. All our operatives hold relevant working-at-height qualifications, and we implemented comprehensive edge protection and fall prevention measures. Regular safety briefings and site inspections also maintained standards.

The HD Sharman coating systems we used provided excellent workability and application characteristics. Our teams found the materials responsive and forgiving, which helped maintain consistent quality across the vast roof area. The manufacturer’s technical support also proved valuable during the application process.

We successfully restored the entire 16,000m² roof area, creating a durable waterproof membrane that will protect the building for years to come. The industrial unit now benefits from comprehensive weather protection, improved appearance, and the confidence that comes with a professionally installed coating system.

Key outcomes included:

  • 16,000m² roof area successfully restored using specialist liquid coating systems
  • Long-term protection achieved through HD Sharman high-performance coatings
  • Improved appearance across roof, cladding, and window frame areas
  • Seamless waterproof membrane eliminating leak risks
  • Extended roof lifespan reducing future maintenance costs
  • Minimal disruption to the client’s operations during the works
  • High-quality finish delivered across all refurbishment elements
  • Project completed on programme despite weather challenges.

The client was extremely pleased with both the quality of our work and our professional approach throughout the project. Our ability to deliver such a large-scale industrial refurbishment while maintaining high standards demonstrated our experience in managing complex roofing programmes.

This project also showcases our capability to handle large roof restoration works efficiently while delivering the quality and reliability that property managers like JLL expect from their contractors.



Luton Airport

London Luton Airport is one of the UK’s major international airports, serving millions of passengers annually and providing essential aircraft maintenance facilities.

The airport’s hangars must remain operational to support the maintenance and servicing of commercial aircraft. And when extensive restoration works are required, they must be delivered without compromising the airport’s demanding operational schedule.

London Luton Airport required a large-scale refurbishment and restoration package across three major aircraft hangars. The scope represented one of the most comprehensive airport maintenance programmes undertaken at the facility.

The works included:

All work had to be delivered within a live airport environment. This meant operating under strict aviation safety protocols, coordinating around aircraft movements, and maintaining full operational capability throughout the project.

ACS successfully restored three huge aircraft hangars at London Luton Airport, delivering a complete refurbishment package across roofing, cladding, and internal areas. The scale of the project required careful coordination across multiple fronts, with different teams working simultaneously on roofing, cladding, and internal works.

The roof restoration programme began with extensive commercial pressure washing to remove years of contamination from the vast roof surfaces. Given the size of aircraft hangars, this work was significant, and it had to be completed to exacting standards.

Our team then carried out comprehensive, cut-edge corrosion treatment across all affected areas. Aircraft hangars are particularly susceptible to cut-edge corrosion due to their large roof spans and exposure to aviation fuel vapours, moisture, and temperature fluctuations. Treating this corrosion will prevent deterioration and protect the structural integrity of the roof systems for longer.

Next, we applied advanced liquid roof coating systems across the entire roof area of all three hangars. These high-performance coatings provide seamless waterproofing, UV protection, and thermal performance.

The skylight replacement programme improved natural lighting throughout the hangars while upgrading thermal efficiency. They will also reduce energy costs and create better working conditions for maintenance personnel.

External cladding spraying and cladding replacement works restored the hangars’ external appearance while providing long-term protection. Where panels were beyond repair, we replaced and spray-finished them to match the restored sections. This created a uniform appearance across all three structures.

Finally, internal decoration works completed the transformation, with commercial painting services applied throughout internal areas to create clean working environments.

This was a six-month project involving more than 40 operatives, making it one of the largest projects ACS Coatings has completed to date. Managing a workforce of this size across three separate hangars within a live airport environment required exceptional planning, coordination, and project management.

A dedicated site management and supervisory team was also in place throughout the project. This team coordinated daily work, managed health and safety across multiple areas, liaised with airport operations, and ensured smooth delivery of all areas.

Working within a live airport environment presented unique challenges that went far beyond typical commercial building refurbishment projects. As a result, all operatives required security clearance and aviation-specific safety training. All work had to be coordinated around aircraft movements, too, with certain activities restricted during operational hours.

The project also required strict adherence to airport-specific regulations. This included everything from material storage and waste management to hot works permits and emergency procedures. Our experienced management team navigated these requirements efficiently while maintaining progress.

Communication was also essential to the success of this project. Daily coordination meetings with airport facilities management ensured that our activities never conflicted with their operations. And when schedule changes or urgent maintenance issues arose, our team responded flexibly while maintaining overall programme targets.

The scale of the works meant multiple trades and activities progressed simultaneously across the three hangars. Roofing teams worked at height while cladding specialists operated on external elevations and decorators completed internal areas. Coordinating these activities required careful sequencing and supervision to maintain productivity.

The project delivered a complete transformation of three large airport hangars, with everything completed to the high standards required for the aviation industry. The hangars now benefit from restored roofing systems, protected cladding, improved natural lighting, and refreshed internal finishes that will serve the airport for many years to come.

Key outcomes included:

  • Three large airport hangars fully restored across the roofing, cladding, and internal areas.
  • Excellent feedback received from London Luton Airport on workmanship and project management.
  • High-quality finishes delivered throughout despite the complexity and scale of the works.
  • Zero safety incidents across six months and more than 40 operatives.
  • Works completed successfully within a highly regulated live airport environment.
  • Full compliance with all aviation safety protocols and airport operational requirements.
  • Continued relationship and additional works secured with the airport following project completion.

The successful delivery of this major project demonstrates ACS Coatings’ capability to manage large-scale, complex refurbishment programmes in the most demanding environments.

The additional work secured following completion reflects the client’s confidence in our ability to deliver exceptional results under challenging conditions.

This project stands as one of ACS Coatings’ flagship achievements, showcasing our experience in aviation facilities and our project management capabilities. It also shows our ability to scale resources effectively while maintaining the highest quality standards.



Assheton House


Assheton House is a live residential high-rise tower block located in Ashton-under-Lyne. As a multi-storey occupied building, maintaining the integrity of the external envelope was critical to protect residents. It was also required to preserve structural performance and extend the building’s lifespan.

Given the building’s height and occupied status, the project required careful planning, specialist access solutions, and strict health and safety controls throughout. That’s why they contacted us here at ACS Coatings.

The client required a comprehensive external refurbishment and commercial waterproofing package to safeguard the building fabric and prevent further deterioration.

The brief included urgent roof waterproofing works, protection of exposed decked areas, a full gutter overhaul, and extensive external decorations to window frames and rendered elevations.

In addition, because the building remained fully occupied throughout the programme, all works needed to be delivered with minimal disruption to residents. Of course, safe access was also required.

In a nutshell, the project required:

  • Installation of a high-performance roof waterproofing system
  • Waterproofing to external decking areas
  • Full commercial gutter refurbishment and drainage improvements
  • External decorations to window frames and rendered elevations
  • Full-height scaffold access to all elevations.

The goal was not only to resolve immediate waterproofing concerns but to future-proof the building against water ingress and weather-related damage.

ACS Coatings mobilised a dedicated site management team supported by a multi-trade workforce, with 8 to 12 operatives on site at any one time. This included specialist waterproofing technicians and access-trained decorators experienced in high-rise building refurbishment.

Then, we got to work, which included:

Roof Waterproofing System

We installed a robust commercial roof waterproofing system designed to create a seamless, protective membrane across vulnerable roof areas. Surface preparation was carried out thoroughly to ensure long-term adhesion and performance.

The new system provides durable protection against heavy rainfall, standing water, and freeze-thaw cycles, all of which are common in the UK.

Waterproofing to External Decking Areas

External decked areas were fully treated and sealed to prevent water penetration into the underlying structure.

Due to the height and exposure of the building, weather sensitivity was carefully managed, with works phased to suit conditions and guarantee the very best curing.

Full Gutter Overhaul & Drainage Improvements

The existing guttering system was showing signs of deterioration and inefficiency. Our team carried out a comprehensive gutter refurbishment, improving drainage flow and reducing the risk of overflow and façade staining.

Effective drainage is critical for high-rise buildings, where blocked or failing gutters can lead to significant water ingress issues over time.

External Decorations to Window Frames & Rendered Elevations

To complete the building envelope refurbishment, we carried out extensive external decorations across all elevations. This included preparation, repairs, and protective coatings to window frames and rendered surfaces.

The result was not only enhanced weather protection but a significantly improved external appearance, reinforcing the building’s overall aesthetic and long-term durability.

Delivering high-rise external refurbishment works on a live residential tower block presents unique challenges. These include:

Live Residential Environment

With residents occupying the building, communication was critical. We maintained proactive liaison with the client team and residents, providing clear updates and scheduling information.

Noise levels were carefully managed, too, and access routes were maintained safely at all times to protect vulnerable occupants.

Full-Height Scaffold & Access Planning

A full-height scaffold system was erected to provide safe access to all elevations. Phased access planning ensured works progressed efficiently without restricting essential building entry points.

Working at height required strict adherence to safety protocols and daily supervision by our experienced site management team.

Weather Sensitivity & Programming

Waterproofing and external coatings at height are highly weather-dependent. Our team carefully monitored conditions to maintain programme momentum while making sure the correct application standards were upheld.

Despite these challenges, the project was completed ahead of schedule, with additional client-instructed works incorporated during the contract period.

Assheton House now benefits from a fully protected external envelope.

The roof and decked areas are secured with high-performance waterproofing systems. The refurbished guttering ensures efficient drainage, reducing long-term risk of water damage. Window frames and rendered elevations have been revitalised, delivering a clean and durable finish across the entire building.

Importantly, all works were delivered in a live residential environment without impacting residents’ day-to-day routines.

Completing the project ahead of schedule further demonstrated ACS Coatings’ ability to deliver complex, high-rise refurbishment projects efficiently and professionally.

Client Feedback

Particular praise was given for:

  • Clear communication throughout
  • Cleanliness and site organisation
  • Safe management of works at height
  • Minimal disruption to residents.

This feedback reflects our commitment to delivering commercial and residential refurbishment projects with professionalism and care.



Rennie Hogg Industrial Estate

Rennie Hogg Industrial Estate comprises multiple large warehouse and industrial units forming part of a wider commercial property portfolio. Over time, both roofs had developed widespread corrosion, particularly along sheet laps and panel edges, alongside areas of active water ingress.

As with many ageing industrial buildings, the structure itself remained fundamentally sound. However, untreated cut-edge corrosion and failing fixings were beginning to compromise the roof’s long-term performance. The client’s priority was therefore to implement a durable roof protection system that would extend lifespan, protect asset value, and minimise operational disruption.

Rather than proceeding directly to costly full roof replacement, the client sought a more sustainable and cost-effective warehouse roof refurbishment solution.

We recommended the application of a 25-year HD Sharman Delcote commercial roof coating system, alongside comprehensive preparation and corrosion remediation works.

The scope included:

  • Full high-pressure cleaning of all roof areas
  • Extensive cut-edge corrosion repair
  • Inspection, treatment, and replacement of roof fixings
  • Specialist preparation of severely corroded sections
  • Application of the HD Sharman system in two full coats to achieve the specified dry film thickness
  • Full QA documentation and manufacturer audit sign-off.

Both roofs were to be delivered concurrently within a tight programme, while maintaining safe access and minimal interference with ongoing industrial operations.

ACS Coatings mobilised a specialist industrial roof coatings team to work across both units simultaneously. This was supported by dedicated site supervision to maintain programme control and quality assurance.

Our work began with deep high-pressure washing to remove contaminants, biological growth, and loose corrosion. This helped with optimal adhesion for the new roof coating system.

Particular attention was paid to areas of advanced cut-edge corrosion. Each affected section was mechanically prepared to remove oxidation before the application of specialist corrosion primers. Severely deteriorated areas required bespoke oversheet components, which were pressed and manufactured on-site to allow effective sealing and stabilisation.

All fixings were inspected and either treated, replaced, or encapsulated to prevent future water ingress.

Finally, the HD Sharman Delcote system was applied in two full coats, achieving the specified dry film thickness (DFT) required for the 25-year warranty. The result was a seamless metal roof restoration that strengthened the roof envelope without replacing existing panels.

Delivering works across two large industrial roofs simultaneously required careful coordination and disciplined quality control.

Working at height across expansive warehouse roof areas, our team implemented strict safety protocols and phased access planning. Weather disruption was managed proactively, too, with flexible programming allowing progress to continue during favourable conditions.

Coordination with separate skylight replacement contractors was also essential to ensure parallel works progressed safely and efficiently. Daily inspections and DFT readings were recorded to verify compliance with manufacturer standards, so the final commercial roof coatings system met all warranty requirements.

All works were completed under full manufacturer audit, resulting in successful sign-off and certification.

Both warehouse roofs were fully restored using a manufacturer-accredited 25-year industrial roof coating system.

The estate now benefits from:

  • Enhanced roof waterproofing performance
  • Stabilised and treated corrosion
  • Extended roof lifespan without replacement
  • A clean, uniform industrial finish.

Despite severe corrosion challenges and adverse weather conditions, the project was completed three weeks ahead of schedule.

And by choosing a high-performance roof protection system instead of full replacement, the client avoided significant material waste and reduced capital expenditure. They also secured long-term asset protection.

Following successful completion and audit approval, ACS Coatings was awarded a further contract based on performance and delivery standards.

Need Long-Term Industrial Roof Protection?



Horwich Train Station

Horwich Train Station is a live operational rail station managed by Network Rail, serving daily commuters and public footfall. As critical public transport infrastructure, the station’s pedestrian bridge and access routes must remain safe, durable, and fully operational at all times.

The bridge deck, ramps, and stair access areas had begun to show signs of wear and surface deterioration. Given the constant heavy foot traffic and exposure to the British weather, a long-term commercial waterproofing and anti-slip solution was required to ensure structural protection and public safety.

Network Rail required a full refurbishment of the pedestrian bridge deck and access ramps, including:

  • Installation of a robust PMMA resin roof waterproofing system
  • Enhanced anti-slip surfacing suitable for heavy public footfall
  • GRP installation to steps and landing areas
  • Surface preparation, priming, and aggregate broadcast wearing course
  • Delivery within strict rail access windows
  • Minimal disruption to live passenger services.

All works also had to comply with Network Rail safety protocols and be completed predominantly out-of-hours.

ACS Coatings deployed a specialist resin and GRP installation team of 6–8 operatives per shift, supported by dedicated supervision and logistics coordination.

Our works included:

PMMA Resin Waterproofing System

We installed a high-performance PMMA resin waterproofing system across the bridge deck and access ramps. This involved full surface preparation, priming, waterproofing membrane application, and wearing course installation.

PMMA systems were used as they are ideal for transport infrastructure due to rapid curing times and excellent durability.

GRP Installation to Steps & Landings

To further improve safety, we also installed GRP anti-slip systems on steps and landing areas. This delivered a durable, impact-resistant surface suitable for constant public footfall.

Resin & Aggregate Broadcast System

A full resin and aggregate broadcast system was applied to create enhanced anti-slip performance across pedestrian areas. This guaranteed compliance with safety standards while improving long-term resilience.

Working within a live transport hub presented several operational challenges.

To minimise disruption to passengers and services, the majority of works were completed during night shifts within strict rail possession windows. Temporary lighting was also installed to maintain safe working conditions. In addition, temperature monitoring resulted in consistent resin curing performance.

All materials and deliveries were carefully coordinated to align with Network Rail access protocols. At the end of every shift, the team carried out a full clean-down, leaving the site safe and presentable for morning commuters.

Despite approximately two weeks of adverse weather, proactive reprogramming and close liaison with the client ensured the overall programme remained on track.

The bridge deck, ramps, steps, and landing areas were fully transformed.

The new PMMA and GRP systems now provide:

  • Long-term commercial waterproofing protection
  • Durable anti-slip surfaces
  • Improved aesthetic presentation
  • Infrastructure fit for heavy daily footfall
  • A refreshed, modern appearance.

The client was extremely pleased with the finish quality and the team’s ability to deliver on schedule under challenging conditions.

Need Specialist Resin & Waterproofing Systems?



Marshall Building

The Marshall Building is a prominent office building located in St Ann’s Square, one of Manchester’s busiest pedestrian and retail areas. The building sits within a mixed-use zone surrounded by commercial premises and residential properties.

Given its city-centre position, the external presentation of the building directly impacts tenant perception and street-level branding.

Unfortunately, over time, environmental pollution and general weathering had dulled the stone façade, while existing coatings on window frames had begun to lose consistency and vibrancy. The client was keen not just to refresh the building visually, but to protect it against further degradation through professional façade cleaning and protective coating systems.

So, they came to us for a high-quality commercial building refurbishment to modernise the external façade and internal feature areas. This was part of a wider office upgrade programme.

The brief included a combination of specialist facility cleaning and decorative coatings:

  • Professional DOFF cleaning to restore stone elevations
  • External commercial spray painting to window frames in a bespoke pearlescent finish
  • Internal on-site spraying of a feature spiral staircase
  • Concurrent gutter repair and maintenance
  • Out-of-hours working due to the live city-centre location.

The finish also needed to be premium, durable, and suitable for a high-visibility commercial property.

ACS mobilised a specialist team of commercial painters, decorators, and façade cleaning operatives, supported by site supervision and traffic management coordination.

Our works included:

  • Low-pressure DOFF steam cleaning to remove pollution and biological growth without damaging the stone
  • Full masking and preparation before external on-site spraying
  • Application of durable protective coatings in a bespoke pearlescent specification
  • Internal spray application to transform the spiral staircase into a feature centrepiece
  • Localised gutter inspections and maintenance while full access was in place.

Prior to any respraying works, full adhesion testing was carried out to confirm coating compatibility and long-term durability. Surface preparation included careful keying of existing substrates and precision masking to protect surrounding glazing and stonework.

All in all, by combining commercial cladding spraying techniques with controlled environmental conditions, we achieved a smooth, factory-grade finish typically associated with off-site powder coating, but delivered entirely in situ.applied to provide durable protection against weathering and UV exposure.

Operating within a dense urban environment required strict compliance with environmental and safety regulations.

Strict overspray containment systems were implemented to prevent airborne particles, and continuous monitoring meant minimal disturbance to neighbouring commercial units and residential apartments.

Deliveries were also timed within restricted access windows to avoid peak pedestrian traffic, maintaining both public safety and project efficiency. All works were scheduled out-of-hours, too, to minimise disruption to businesses and residents. Traffic management plans, banksmen, and controlled delivery windows meant materials were brought in safely.

The DOFF cleaning system also allowed us to restore the façade without abrasion, preserving the integrity of the stone while dramatically improving appearance.

The transformation significantly enhanced the Marshall Building street presence.

The restored stonework now presents a clean, refreshed exterior, and the bespoke sprayed window frames provide a modern finish. Internally, the staircase has become a defining architectural feature within the refurbished office space.

Beyond aesthetic improvement, the new protective coatings now provide enhanced resistance to UV degradation, moisture penetration, and general environmental wear. This extends the lifecycle of the window frames and external metalwork, reducing the need for reactive maintenance and supporting long-term asset management planning. The result is not simply a cosmetic upgrade, but a strategic investment in the building’s future performance.

It’s no surprise that the client praised our planning, safety coordination, and quality of finish delivered in such a high-footfall location.

Need Professional Façade Cleaning or Commercial Spray Painting?



Babcock Facilities Management


Babcock Facilities Management needed to address deteriorating cladding coatings on a commercial property in Leicestershire. The high-level cladding had begun to fail across all four elevations, thus creating potential compliance issues with landlord maintenance standards.

Without any intervention, the building risked further deterioration and significant dilapidation costs after the lease was up. So, Babcock required a specialist contractor capable of working at height and delivering a high-quality finish without disrupting day-to-day operations. Which is why they chose ACS Coatings.

The client required a complete refurbishment of the failing high-level cladding. This included:

  • Full pressure washing of the entire building
  • Stripping of all failed and deteriorated coatings at high levels
  • Surface preparation and application of specialist primers
  • Re-spraying the entire top cladding band to a clean white finish.

ACS carried out a comprehensive cladding refurbishment programme across all four elevations.

This included:

  • Pressure washing the entire building exterior to remove dirt and loose materials
  • Stripping all failed coatings from the high-level cladding
  • Thorough surface preparation to create a sound substrate
  • Application of specialist primers for long-term adhesion
  • Precise masking to protect adjacent surfaces
  • Professional re-spraying to restore the cladding to a clean white finish.

The team used controlled preparation techniques to remove deteriorated material without damaging the underlying substrate. On top of this, high-performance coating systems were applied to provide durable protection against weathering and UV exposure.

The works were delivered mostly over weekends to avoid disrupting business operations. Because each phase came with tight timeframes, planning and efficient execution were of the utmost importance.

Specialist access methods were also employed to safely reach the high-level cladding. The team worked from mobile elevated work platforms and scaffolding, maintaining strict safety controls throughout. Weather conditions were closely monitored, too, with coating applications scheduled to ensure proper adhesion and curing.

Surface preparation was also critical to the project’s success. As such, all loose and failing material was removed, edges were feathered, and surfaces were cleaned before priming. This methodical approach created the foundation for a long-lasting finish.

Finally, the masking process protected brickwork, windows, and lower cladding sections from overspray. Once masking was complete, the team applied the final coating system using professional spray equipment to achieve a smooth, even finish across all elevations.

The high-level cladding was fully restored with a fresh, clean appearance. The building now benefits from long-term protective coatings that will resist future weathering and deterioration.

Most importantly, the works brought the property back in line with landlord maintenance expectations. This helped Babcock avoid costly dilapidation claims and maintained the building’s value. The weekend delivery schedule also meant business operations continued without interruption throughout the project.

Because of all of this, the client praised the quality of the work and the professionalism of the ACS team.